The distiller's grains dryer equipment ordered by Anhui Yingjia large-scale distiller's grains factory has been officially put into production.
The Shandong customer asked our company to transform a set of mushroom dregs dryer and ordered a set of bean dregs dryer. Both sets of equipment have been officially put into production.
A Vietnam customer ordered a set of 500 kg/h yeast dryer equipment in our company, has been formally put into production and operation in good condition.
The yeast dryer purchased by Inner Mongolia from our company has been officially put into operation. This equipment is used to dry the bacteria and adopts indirect heating system, suitable for drying beer yeast, yeast flakes, potassium humate, sodium huma
Thailand Yeast Dryer is another yeast drying equipment that our company has built this year. This project is suitable for the drying treatment of waste beer yeast, which can solve the problem of local customers handling yeast.
Jiutian Cassava dregs drying equipment has finished installed in Vietnam. The equipment used by the company's "mechanical dehydration + drum drying + pulse air drying " special Chinese patent technology, an effective solution to the traditional dryer
The sweet potato residue drying project that our company cooperates with Shaanxi customers has been officially completed. The installation and commissioning work of this project has been completed, and the equipment can be officially put into operation af
Nigeria customer inspected brewer's grain spent dryer projection in March in 2014. In May of 2014, they purchased a set of brewery’s grains dryer with the daily capacity of 60-80t after two months’ inspection. This equipment has normally been put into us
Laos customer inspected the brewer's grain Spent dryer project in October 2014. After inspection two months they purchased the brewer’s grain dryer whose daily capacity is 60-80t.
At the beginning of March, Jiangsu customers purchased our Brewer's Grain Drying Equipment. The two parties reached an agreement on the details of the project cooperation and signed the contract. Last month, the equipment was finished and shipped to the